Bolder automation GmbH    
   

Features

 

How to save material

Example of a calculation

Check your ROI

   
 

Example of a ROI calculation

 
JAVA Applet
 
Please make sure that your browser enables JAVA - applets:
 
  • Firefox: Settings/Content/Activate Java
  • Internet Explorer: Activate Java environment
 
material savings by gravimetric control
 
 
Legend
Currency Enter your currency first to get the right units
Investment Estimate investment including equipment, installation etc.
Operating time Operating time of the line during one year [h/a]:
i.e.
  • 1 shift, 8 hours, 200days: 1600h/a
  • 2 shifts, 8 hours, 300days: 4800h/a
  • 3 shifts, 8 hours, 330days: 8000h/a

Material cost cost of material per kg
Material saving estimate savings in % by downscaling the set-point
   
Range of ROI Range of ROI in years [a]
Range of massflow Operating range of extruder oder blend feeder [kg/h]
   
ADD The radio button indicates the next color which is choosen to add a new graph with pressing ADD
DELETE Deletes the choosen graph
RESET ALL Deletes all graphs
   
PRINT Print screen with diagram
   
Close Window Exit from calculation
 
PS: If you use other units than ISO you can use the calaculation as long as you are consequent with the input values and units
 
 
 
Calculation
     
    check your ROI
     
     
 
 
Back
     
   

Homepage